MARO CABLE-STAYED FOOTBRIDGE (MALAGA – SPAIN)

Technical Data Sheet

  • Date: 2007–2008
  • Client: DRAGADOS
  • Scope: Construction project/Technical assistance
  • Type: Cable-stayed footbridge with mixed deck
  • Span: 16.5 m + 46.5 m
  • Developer: SPANISH MINISTRY OF DEVELOPMENT