NEW CHAMPLAIN BRIDGE (MONTREAL – CANADA)

Technical Data Sheet

  • Date: 2015–present
  • Client: TECADE, S.A.
  • Scope: Technical assistance for the manufacture of cable-stayed metal structure
  • Type: Cable-stayed bridge with 3 parallel decks
  • Span: 80.4 m + 124 m + 240 m + 84.4 m
  • Developer: Infrastructure Canada

Photo source: http://www.infrastructure.gc.ca/nbsl-npsl/architecture-eng.html